History (continued)

Old Sanctuary, from the west, facing east. Notice the steeple at the far end of the building (at the top of the photo). The two story education wing is in the left-most portion of this photo.

New Fellowship Hall (background) and Office Suite (at right) facing south. The brick surface was removed by 1990 when the Columbarium was installed.

To purchase a complete electronic copy of A Centennial History: Our First Hundred Years in Words and Pictures for $8.00, click here. You will receive a confirmation email for your payment, and within 24 hours, another email with a link to download the book.

 

 

 

 

 

Construction Photos of new Fellowship Hall and Office Suite

 

 

 

 

 

 


1987 Purchase of “Church House”

1990 Columbarium installed in courtyard between Education Building and Sanctuary

 

 

 

 

 

 

 

 

1992 New Education Wing and Narthex
The west end stained glass in the sanctuary was shortened with a large doorway added; original sanctuary
entrance through bell tower closed off and the covered walkway was removed. The office wing was re-configured
to connect to the new education wing. A second-story walkway was added to connect the new education wing to the sanctuary.

 

 

 

 

 

 

 

Click here for a list of numerous persons who have served in mission around the world
who have at some point been affiliated with our congregation

Click here for our current missionary co-workers